The Project tab displays information on Projects that are currently in progress or that have been completed. From the Project tab, a user can view the Project Workflow, review Project Fields, attach Files to the Project, and more.
Opening a Project Tab
- Use the Search bar to search by Plan name.
- Expand the Plans result list and locate the desired Plan entry.
- To the right of the Plan details, expand Projects.
- Select the name of the Project.
- Alternatively, open the Project directly from the Plan tab > Projects view.
Tier Availability: Business
Article Contents
The Project Tab Header
The tab header is displayed at the top of the tab, above any selected view. The header contains the following items, presented from left to right:
- The Plan Name that the Project was launched under. Selecting the Plan Name returns the user to the Plan tab.
- The Project Name.
- A Progress Bar displaying the completion percentage of the Project based off of completed Tasks. If the Project has been completed, the Completed Date displays instead.
- The Add Time Slip
icon; selecting this displays the Add Time Slip popup window. Time Slips created in this way will be linked to the Project automatically.
- When selected while in the Workflow view, Add Time Slip
also links the Task Grouping or Task that is currently displayed.
- When selected while in the Workflow view, Add Time Slip
- The Help
icon, which opens this article in a new browser window.
- The More
icon, which contains menu options for the following actions:
- Sending a Fast Blast
- Aborting the Project
- Creating Merge Documents
- Reassigning Tasks
- Using ftwilliam.com Navigation Assistance
Navigating Project Views
The Views panel on the left side of the Project tab separates Project information into a selection of categories. The Project tab contains the following views: Summary, Project Fields, Workflow, Files, Data Collection, To-Dos, Time, Notes, Assoc. Projects, Plan Cycle.
Editing Attributes
Requires Security Rights: Add/Edit Project
Some views, such as the Summary view, contain attributes and information that define the Project. To edit these attributes:
- Select Edit
at the top-right of the view. The corresponding window displays.
- Make any necessary changes.
- Select Save.
Adding Records
Other views, like the Files and Notes views, contain lists of records attached to the Project. In these views, records can be added by performing the following steps:
- Select Add
at the top-right of the view. The corresponding window displays.
- Complete the required fields.
- Select Save.
Views on the Project Tab
The aim of this guide is not to provide an exhaustive list of Project attributes and properties. However, any items of particular note are covered in each view's section, below.
Summary
The Summary view displays the basic Project information, including relevant dates, the Project Type, and the Project Manager. Use Edit at the top-right of the grid to make changes to this information.
- The following field is required: Manager
- The following fields may be required depending on the Project Type: Period Start Date, Period End Date
- Description can only be edited for non-recurring Projects.
For Annual Data Collection Projects, any updates to the Period Start and Period End fields will automatically update the corresponding Plan Cycle and Employer data records.
If Extendable is selected, an Extension Project can be created and attached to the original Project by selecting the Create Extension button within the grid.
Project Fields
The Project Fields view displays any Project Fields for which data has been provided during the completion of the Project. When a Project Field Value is recorded from a Task Item, the Project Field and corresponding Value is automatically added to the grid.
Project Fields values cannot be added or edited on this view; it is only for reference purposes. For more information on Project Fields, refer to the article Project Fields.
Workflow
The Workflow view initially displays the Task Groupings for the Project, as well as the Completed Date if all the Tasks within a Grouping have been completed. Double-clicking a Task Grouping displays the Tasks within that Grouping.
Viewing a Grouping's Tasks
Within a Task Grouping, PensionPro displays each contained Task along with its assigned Employee, current state, and completion date (if applicable).
If the user has the appropriate Security Rights, individual Tasks can be quickly reassigned or Overridden by selecting the buttons within the Employee and Overridden On columns. These buttons are only available when reassignment or override actions are possible.
Double-clicking a Task displays its Task Items and other details.
Viewing Task Details
When viewing Task details, the Workflow view is divided into four view tabs, located below the tab header: Task Items, Summary, Time, and Review.
Task Items: The individual steps and data fields that are required to complete the Task are displayed on the Task Items view tab. If the Task is active, the assignee can enter data for each item—if required—and select Complete when the Task is finished to advance the workflow to the next Task.
The following options are available for Task Items:
- If the user has Reassignment Security Rights, the Assignee
badge can be selected to change the Employee that the Task is assigned to. This badge displays the initials of the current assignee, or "U" if the Task is unassigned.
-
Save
will store any data that has been entered for Task Items, but does not complete the Task. This is useful when a partially-completed Task must be finished at a later time.
- The More
menu contains options that can alter the order in which Tasks are performed:
- Remove Completion will return a Task to an active state after it has been completed. This will also remove the Completion Date from any subsequent Tasks within that Grouping.
- Activate will set a future Task to an active state, meaning it will be displayed on Dashboards and Worktrays and can be worked. However, this Task can't be completed until all prior Tasks are completed. This is useful for allowing an individual to get an advance start on a Task.
- Return will only be available if the Task was designated as a Review Step in the Project Template. If the review determines that a previous Task within the Grouping was not completed correctly, this option will allow the reviewer to return the workflow back to that Task. It will be set as the active Task, and any Tasks between it and the Review Step will need to be re-completed.
Summary: Administrative information for the Task can be found on the Summary view tab. Select Edit to make changes to these fields.
- The following fields are List Values located under Core > Projects: Category, Task Status.
- The values for the Event field are Events, which are managed in Maintenance > Preferences > Event Configurations.
Time: Any Time Slip entries that were linked to the Task display on the Time view tab. Records in the grid are populated automatically and cannot be edited.
Review: If the Task is a Review Step, the fields that require review are displayed in this view tab.
Files
The Files view contains any stored documents related to this Project.
Use Add at the top-right of the grid to add a new file, or hover over any entry to display the Edit
and Delete
options on the right-hand side. Double-clicking a File downloads it to the user's device.
Selecting View Access Log in the Title column opens a window displaying the name of any Plan Sponsors or PensionPro users who accessed the File, as well as the date and time the File was accessed. This tracking ability can assist in managing Data Security, as well as determining whether the Plan Sponsor ever opened the File.
Archived Files are hidden from the Files views by default; to view these records, select More > Show Archived.
If using PensionPro's DocuSign integration, uploaded Files can be sent to contacts for E-Signature purposes. To do so, click to select the File in the grid, then select More > Send E-Signature Document. This feature is covered more extensively in the article DocuSign Integration.
For more information on using Files, refer to the article Files & Documents.
Data Collection
If Web Data Collection is required for an Annual Administration or General Web Collection Project, the relevant views will appear under this grouping. Otherwise, the Data Collection grouping will not be available.
For more details on these views, refer to the Data Collection steps outlined in the article Overview of Web Data Collection.
To-Dos
The To-Dos view displays any To-Do items that relate to the Project. These are reminders or directions that assist in tracking and completing unexpected work.
Use Add at the top-right of the grid to add a new To-Do, or hover over any entry to display the Edit
and Delete
options on the right-hand side. For more information, refer to the article To-Dos.
Time
The Time view displays all Time Slip entries that are linked to the Project. Time Slip records cannot be added or edited within this view; instead, the grid automatically populates when Employees add new Time Slip entries.
For more information on timekeeping, refer to the article Recording & Tracking Time.
Notes
The Notes view is used for recording any miscellaneous information that pertains to the Project. This could reflect an exemption to the standard process, provide information to future Task assignees, or simply record information that doesn't fit anywhere else.
Use Add at the top-right of the grid to add a new Note, or hover over any entry to display the Edit
and Delete
options on the right-hand side. To view archived Notes, select More
> Show Archived.
For more information, refer to the article Notes.
Associated Projects
The Assoc. Projects view displays other Projects that are associated with the current Project. Generally, this will only apply to an Annual Administration Project which has had an Extension launched. This does not apply to the Extension itself; its parent Project does not display in this view.
Double-clicking an Associated Project will open it in a new Project tab.
Plan Cycle
If the Project is an Annual Data Collection Project, selecting Plan Cycle will open the corresponding Plan Cycle record in a new tab. For all other Projects, the Plan Cycle option will not be available.